ENERTECH INTERNATIONAL INC.
ENERTECH INTERNATIONAL INC.
Chungcheongbuk-do, South Korea
6YRSENERTECH INTERNATIONAL INC.

Aperçu de l'entreprise

Album de la société

Informations de base

Capacité du produit

Information de l'usine

Taille de l’usine
10,000-30,000 square meters
Lieu de l’usine
Chungcheongbuk-do, Chungju-Si, Sourth Korea
Nbre de lignes de production
Above 10
Fabrication sous contrat
OEM Service Offered, Design Service Offered, Buyer Label Offered
Valeur de la production annuelle
US$10 Million - US$50 Million

Capacité De Production annuelle

Nom du produit
Unités Produites
HighestEver
UnitType
Vérifié
Electrode
100000
250000
Kilowatt/Kilowatts
Lithium Polymer Cell
60000
120000
Kilowatt/Kilowatts
Lithium Ion Battery / Module (Small/Medium)
185000
500000
Pack/Packs
ESS / EV Battery Pack (Large)
2000
5000
Piece/Pieces
Vérifié

Contrôle de la qualité

Processus de Gestion de La qualité

Desgin Process for new product
New product process portfolio Planning, DV, PV, Production Pliot production, Preproduction, Mass Production
PPAP
Ensure that new materials have the appropriate properties to meet quality and enviromental requirment.
Supplier Audit & Performance
Ensure that supplier has an ability for quality assurance to meet requirment of Enertech's quality standards.
Process Monitoring
Planning, Root Cause Analysis, Update control limit
Process Patrol
Establish range of control, make check list, process patrol, report & review, completion

L'équipement d'essai

Machine Nom
Marque et Modèle NO
Quantité
Vérifié
Battery Cycler
PNE Solutions
4
Battery Tester
Hioki
1
Digtal Multimeter
HP
5
ESD Tester
Noiseken
1
Large battery cycler
Aeroviornment
1
Large battery pack cycler
Bitrode
1
Low Pressure Chamber
Jeiotec
1
Power Supply
VUPOWE
1
Shock Tester
Lansmont
1
Temperature Test Chamber
Jeiotec
2
Thermal Cycle Chamber
Jeiotec
1
Vibration Tester
LDS
1
Vérifié

R & D Capacité

R & D Processus

Design and Development Process
APQP 1. Process for contract review and orders Customer requirement (RFI) reveiw
Design and Development Process
APQP 2. Design Review / Validation Plan / DFMEA BOM buidling
Design and Development Plan
APQP 3. Establish PFMEA Gate reveiw report
Design and Development Plan
APQP 4. Plan for MSA Plan for production capability PPAP Approval

Recherche et Développement

11 - 20 People